design. group work.

in the current remaining cost calculation report part, the rvt file is the design content, which contains various engineering quantities. Calculate the cost according to the content of the rvt file, and make a calculation table like the picture (1).The client is interested in how much the proposed building will cost. Use the BCIS database of historic building costs to estimate the cost of your building, expressed per square metre of floor area.
Output required
A sub-group of the design team (probably comprising QS students) must be involved in developing the cost estimate.
A short report on a single A3 sheet (max 1000 words) which describes the process by which you have generated this cost from the information in the database and shows the estimated cost of your building at current prices using a reliable preliminary cost estimate method.